•Started in 2015 from Jiangxi shale gas well logging, FairOak well logging service has multiple open-hole wireline well logging teams and six direct push storage well logging teams as of today, including Xinjiang Luntai project team, Sichuan and Chongqing project team, Northeast project team and Northern Shaanxi project team. It is equipped with WILS wireline logging system and PILS direct push storage logging system independently developed and produced itself. The well logging service has served for more than 500 wells, recording an excellent rate of 95% of well logging data and of 100% in hydrocarbon discovery. It has completed well logging tasks of key wells and discovery wells for CNPC, Sinopec, ZPEC and Shangxi Yanchang Petroleum(Group) Co.,Ltd., such as Zhaoye 1, Xushen 6-Ping 6, Gulong 2, Huafye 2, Longxin 1, Shunbei 41X, Manshen 502, Fuyuan 4, Shuangyu 001-H4, etc.
- Not available
- Not available
1. WILS Electric well logging service:
During 2020-2022, the cable imaging system independently developed and produced by the company has helped two logging teams complete 357 well logging tasks in ZPEC Wenshu Oilfield, especially some of which were quite challenging such as horizontal wells Wen 8-4-H1. Despite of the technical difficulty of wet joint docking in the horizontal section, challenges imposed by the only 16mm annulus between casing and drill has also been overcomed.
2. PILS Direct push storage well logging service:
The company independently developed and produced the direct push storage imaging system has served 156 well-times tasks for CNPC, Sinopec, ZPEC and Shangxi Yanchang Petroleum(Group) Co.,Ltd. along with six well logging team during the period from 2020 to 2022. With many wells having no conditions for wireline logging but complex conditions such as overflow, leakage, high temperature, and high pressure technicians maintained test instruments in advance and made plans for each well in order to keep the success rate, especially for the Shuangyu 001-H4, the deepest gas well onshore in China with a depth of 9010 meters, of which the bottom hole temperature was 185 degrees and the highest pressure was 165MPA. And all the data of the well were obtained in one single logging, recording a rate of 100% in fine data.
In the past few years, FairOak has successfully established an engineering and technical service team that dares to fight hard. Although the team consists of a dozen people, they have carried out engineering services in Sichuan and Chongqing, northern Shaanxi, northwest and northeast China, and won a good reputation in the industry for their rich service experience and professional technical ability in providing quality well logging services for oilfield companies such as CNPC, Sinopec, ZPEC and Shangxi Yanchang Petroleum(Group) Co.,Ltd.